Drilling at Adelong project. Source: 3D Resources
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • 3D Resources (DDD) sees high grade results in its final assays following drilling at the Challenger deposit, within the Adelong Goldfield in Southern NSW
  • The company says results from the recently completed program at the Challenger gold project further confirm that higher grade material exists below the planned open cut mine
  • 3D Resources says it’s encouraged by the latest results, with the campaign intersecting potentially commercial grade mineralisation
  • A regional exploration program is now in the works, while DDD waits for weather conditions to pass, with drilling set to continue through to 2022
  • 3D Resources last traded at 0.4 cents on October 22

3D Resources (DDD) has seen high grade results in final assays following drilling at the Challenger deposit, within the Adelong Goldfield in Southern New South Wales.

The company said results from the recently completed program at the Challenger gold project provided further confirmation that higher grade material exists below the planned open cut mine.

The program was designed to test the deposit around the periphery of the planned open cut mine, focussing on an area below the open cut where past drilling had hinted at a zone of lower grade mineralisation.

A part of the drilling program was therefore designed to target the area to see if it would be possible to extend the open pit deeper.

New results from the reverse circulation program included 15 metres at 2.85 grams of gold per tonne (g/t) from 105 metres and five metres at 2.79g/t gold from 168 metres.

Additionally, a drill hole was positioned in the core of the Challenger open cut to offer samples for testing the “waste” material for potential acid formation.

3D Resources Managing Director Peter Mitchell said the company was encouraged by the latest results, with the campaign intersecting potentially commercial grade mineralisation.

“These results show the potential for a higher grade zone that may extend commercial development below the current planned open cut but have also helped confirm the mineralisation and interpretation within the planned pit.”

A regional exploration program is now in the works, while DDD waits for weather conditions to pass. With the tick of approval from the government, the company plans to begin additional programs through to 2022.

3D Resources last traded at 0.4 cents on October 22.

DDD by the numbers
More From The Market Online

Magnum into next exploration phase across both Parker, La Cienega with airborne geo surveys

Magnum Mining and Exploration is heading into the next phase of exploration at Parker and La…

EV Resources on ‘accelerated pathway’ to Los Lirios restart after strong antimony recovery tests

EV Resources is inching closer to a Los Lirios restart after strong metallurgical results set up…
Diamond drilling at Bankan.

‘Inferior’: Perseus backs down on Predictive merger – but not without swipe at Robex

Perseus Mining has thumbed its nose at Robex as it heads out the door, stepping away…
A dirt road running through the Antimony Canyon project in Utah.

American Tungsten and Antimony leaves ‘Trigg’ name behind to start next era (and set fresh focus)

American Tungsten and Antimony has entered a new era, leaving the name "Trigg Minerals" behind to…