Chalice Gold Mines (ASX:CHN) - Managing Director, Alex Dorsch
Managing Director, Alex Dorsch
Source: 121 Mining Investment Events
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Chalice Gold Mines (CHN) has intersected significant new results from ongoing drilling at its Julimar Project in Western Australia
  • Results grading up to 5.3 grammes per tonne palladium, 1.3 per cent nickel, and 0.6 per cent copper were identified
  • These results have confirmed that significantly high nickel-copper-PGE grades can be identified at the project
  • The company will now explore and evaluate the nickel-copper zones and is aiming to outline a preliminary mineral resource estimate within 12 months
  • Chalice is up 4.89 per cent in mid-morning trade and shares are selling for 96.5 cents each

Chalice Gold Mines (CHN) has intersected significant new results from ongoing drilling at its Julimar Nickel-Copper-PGE Project.

Julimar is located in Western Australia, approximately 70 kilometres northeast of Perth.

A total of three rigs — two reverse circulation (RC) and one diamond — are drilling at the Gonneville Intrusive. Results have demonstrated high-grade nickel-copper-PGE (platinum group element) zones in massive sulphides.

Additionally, an electromagnetic (EM) survey was also undertaken over the entire intrusive to identify new targets and the continuations of existing targets.

Hole JD003

Chalice has received results from hole JD003, while results for an additional 10 holes are pending.

This hole was drilled to target a high-priority off-hole conductor that was previously identified.

A significant result of 17.6 metres at 5.3g/t palladium, 1g/t platinum, 1.3 per cent nickel, 0.6 per cent copper, and 0.07 per cent cobalt from 191.4 meres has exceeded the company’s expectations.

This result has confirmed that significantly high nickel-copper-PGE grades can be identified.

Hole JD003 also intersected a near-surface PGE-rich oxide interval of 19 metres at 1.6g/t palladium and 0.4g/t platinum from nine metres, as well as several PGE-rich sulphide intervals.

Chalice will now explore and evaluate the nickel-copper-PGE zones and is aiming to outline a preliminary mineral resource estimate within the next 12 months.

The company is also planning to gain access approvals to undertake exploration within the Julimar State Forest, carry out EM geophysics, and continue with RC and diamond drilling.

Chalice is up 4.89 per cent in mid-morning trade and shares are selling for 96.5 cents each at 10:25 am AEST.

CHN by the numbers
More From The Market Online

Lithium Universe ends the quarter charged up for Quebec Refinery roll-out

Lithium Universe has closed off the March quarter with a new Chief Financial Officer and strategically located land…

Alligator snaps at extended mineralisation of Blackbush uranium deposit in SA

Extension drilling in the first four months of this year at the Samphire Uranium Project in South Australia has enabled Alligator Energy Ltd

Mine study work sees 70% boost in gold resource for Nexus in WA’s Goldfields

Nexus Minerals has bumped up the Crusader-Templar combined mineral resource estimate by more than 70% at…

Patriot revs up to lithium grades above 5% drilling at Corvette in Quebec

Patriot Battery Metals has identified solid lithium intersects across wide intervals from drilling at its Covette…