Blackstone Minerals (ASX:BSX) - Managing Director, Scott Williamson
Managing Director, Scott Williamson
Source: Blackstone Minerals
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Blackstone Minerals (BSX) intersects almost 375 metres of nickel sulphide from its Ban Phuc DSS deposit at its Ta Khoa Project in Northern Vietnam
  • The company’s final infill drill program at the deposit return some of the best disseminated results to date, including 374.7 metres at 0.3 per cent nickel
  • The company says the deposit results will underpin its Upstream Business Unit pre-feasibility study due later this year
  • Results from this program at the Ban Phuc deposit will be included into an updated resource estimate and form the basis of an updated mine plan
  • Blackstone Minerals is up 8.24 per cent, trading at 46 cents

Blackstone Minerals (BSX) has intersected almost 375 metres of nickel sulphide from its Ban Phuc DSS deposit at its Ta Khoa Project in Northern Vietnam.

Blackstone’s final infill drill program at the deposit intersected some of the best disseminated results to date, including 374.7 metres at 0.3 per cent nickel, 0.1 per cent copper, 0.01 per cent cobalt and 0.07 grams per tonne (g/t) platinum group element (PGE) from two metres.

The drilling aimed to increase the indicated and inferred mineral reserve of the existing JORC resource.

Managing Director, Scott Williamson, said the Ban Phuc deposit will underpin the Upstream Business Unit (UBU) pre-feasibility study due later this year.

“In the relatively short amount of time since acquiring the Ta Khoa Nickel Copper PGE Project, Blackstone has been able to define a large, disseminated sulfide deposit which considerably adds to the security of supply for the company’s vertically integrated downstream refinery.”

Results from the final infill drilling program at the Ban Phuc deposit will be included into an updated resource estimate and form the basis of an updated mine plan.

Blackstone Minerals was up 8.24 per cent, trading at 46 cents at 12:56 pm AEST.

BSX by the numbers
More From The Market Online
Work operations being built at Yoquivo by Advance Metals team.

Ready to roll: Advance expecting Yoquivo results rush to start in early January

Advance Metals is fast-approaching a busy period for reporting, with the explorer expecting a whole heaping…

Boab taking Sorby Hills into construction, execution in early CY26 after quick FID

Boab Metals is taking Sorby Hills Silver-Lead Project from development into construction and execution in CY26…

Magnum into next exploration phase across both Parker, La Cienega with airborne geo surveys

Magnum Mining and Exploration is heading into the next phase of exploration at Parker and La…

EV Resources on ‘accelerated pathway’ to Los Lirios restart after strong antimony recovery tests

EV Resources is inching closer to a Los Lirios restart after strong metallurgical results set up…