Source: Inca Minerals
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Inca Minerals (ICG) upgrades the potential of its MaCauley Creek Project in North Queensland after sighting copper mineralisation
  • A recent surface mapping and sampling program found visible skarn-style copper in multiple locations across its Mount Brown, Wallaroo and Carraway North prospects
  • A total of 110 samples were collected from 12 prospect areas, with mineralisation extending over 850 metres in strike length in one instance
  • As a result, MaCauley’s potential has been elevated and is thought to be an exceptional exploration project warranting considerable exploration
  • Inca Minerals last traded at 12.5 cents on August 25

Inca Minerals (ICG) has upgraded the potential of its MaCauley Creek Project in North Queensland after sighting copper mineralisation.

A recent surface mapping and sampling program found visible skarn-style copper mineralisation in multiple locations across its Mount Brown, Wallaroo and Carraway North prospects.

A total of 110 samples were collected from 12 prospect areas, offering a variety of exposures, and sent to labs for analysis.

The program aimed to investigate recently identified prospect areas in the northern part of the project generated from an independent review and remodelling of historical geophysical and geochemical data, while also looking into new locations in the central and southern parts.

Mapping identified several mineralised skarn occurrences and a gossanous porphyry, also known as the weathered remains of sulphide mineralisation.

The Wallaroo Prospect saw visible skarn-style copper mineralisation extending over 850 metres in strike length, while Carraway North saw visible copper extend over 550 metres strike length, with widths varying up to 15 metres.

As a result, the project has been elevated in terms of its potential to host skarn and porphyry mineralisation at the MaCauley Creek Project.

Inca said MaCauley is now considered an exceptional exploration project warranting considerable fast-tracked exploration.

Inca Minerals last traded at 12.5 cents on August 25.

ICG by the numbers
More From The Market Online
Work operations being built at Yoquivo by Advance Metals team.

Ready to roll: Advance expecting Yoquivo results rush to start in early January

Advance Metals is fast-approaching a busy period for reporting, with the explorer expecting a whole heaping…

Boab taking Sorby Hills into construction, execution in early CY26 after quick FID

Boab Metals is taking Sorby Hills Silver-Lead Project from development into construction and execution in CY26…

Magnum into next exploration phase across both Parker, La Cienega with airborne geo surveys

Magnum Mining and Exploration is heading into the next phase of exploration at Parker and La…

EV Resources on ‘accelerated pathway’ to Los Lirios restart after strong antimony recovery tests

EV Resources is inching closer to a Los Lirios restart after strong metallurgical results set up…