Balkan Mining and Minerals (ASX:BMM) - Managing Director, Ross Cotton
Managing Director, Ross Cotton
Source: Balkan Mining and Minerals
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Balkan Mining and Minerals (BMM) begins a surface sampling program at the Dobrinja Lithium-Borate Project in Serbia
  • Once sampling at Dobrinja has been completed, the geological team will move to the Pranjani Project
  • Results from the surface sampling will be assessed with mapping information to prioritise drill targets for future programs
  • Balkan is down 4.38 per cent on the market with shares trading at 76.5 cents at 2:17 pm AEST

Balkan Mining and Minerals (BMM) has begun a surface sampling program at the Dobrinja Lithium-Borate Project in Serbia.

The 37.58 square kilometre Dobrinja Project lies in Western Serbia along trend from where lithium-borate mineral resources and ore reserves have been defined.

Once sampling at Dobrinja has been completed, the geological team will move to the Pranjani Project.

The Pranjani Project lies 10 kilometres to the northeast of Dobrinja in a basin that is believed to be connected to the latter.

Historical data shows elevated lithium and boron levels with lithium values ranging between 145 to 478 parts per million (ppm), and boron values ranging between 41 to 585 ppm.

Results from the surface sampling will be assessed with mapping information to prioritise drill targets for future programs.

Additionally, once the sampling wraps up, Balkan will undertake a gravity survey with aims of defining basin geometry.

Managing Director Ross Cotton commented on the sampling program.

“Dobrinja is particularly interesting as it shows a lot of outcropping, which is a good indicator for lithium and borates,” Mr Cotton said.

“We are pleased that we have continued to deliver on our objectives and not have wasted any time on beginning our programs and advancing our projects.”

Balkan was down 4.38 per cent on the market with shares trading at 76.5 cents at 2:17 pm AEST.

BMM by the numbers
More From The Market Online
Work operations being built at Yoquivo by Advance Metals team.

Ready to roll: Advance expecting Yoquivo results rush to start in early January

Advance Metals is fast-approaching a busy period for reporting, with the explorer expecting a whole heaping…

Boab taking Sorby Hills into construction, execution in early CY26 after quick FID

Boab Metals is taking Sorby Hills Silver-Lead Project from development into construction and execution in CY26…

Magnum into next exploration phase across both Parker, La Cienega with airborne geo surveys

Magnum Mining and Exploration is heading into the next phase of exploration at Parker and La…

EV Resources on ‘accelerated pathway’ to Los Lirios restart after strong antimony recovery tests

EV Resources is inching closer to a Los Lirios restart after strong metallurgical results set up…