Rig two completing the Rougemont-2 well for production. Source: State Gas
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • State Gas (GAS) commences production testing at the Rougemont-2 well in Central Queensland
  • The Rougemont 1 and 2 wells were the first wells awarded to the company last October
  • The wells, south-west of Rolleston, were drilled to test the potential of the eastern area of the permit for a coal seam gas project, targeting the Bandanna coal measures
  • Both wells intersected about eight metres of net Bandanna coal, primarily in two seams each more than two metres thick
  • On the market, State Gas is up 1.61 per cent and is trading at 31.5 cents per share

State Gas (GAS) has commenced production testing at the Rougemont-2 well in Central Queensland.

The Rougemont 1 and 2 wells were the first wells awarded to the company last October.

The wells, south-west of Rolleston, were drilled to test the potential of the eastern area of the permit for a coal seam gas project, targeting the Bandanna coal measures.

Both wells intersected about eight metres of net Bandanna coal, primarily in two
seams each more than two metres thick.

Permeability testing during drilling showed permeability in the Rougemont-2 well at 395mD — a promising result.

State Gas has now commenced the process of proving this permeability, with the first production test for the region commencing yesterday.

Water levels in the well will be slowly reduced at a controlled rate to carefully manage downhole pressures. Initial gas production is expected to be similarly controlled at low rates, and increase over time.

The focus has now turned to the company’s Reid Dome Project at PL 231, with production works at the Serocold-1 and Nyanda-8 wells to commece soon.

“These works are the next step in progressing the project towards delivering new gas supplies to meet forecast shortfalls in the east coast Australian gas market,” the company said.

On the market, State Gas was up 1.61 per cent and is trading at 31.5 cents per share at 1:19 pm AEDT.

GAS by the numbers
More From The Market Online

Listen: HotCopper Wire CY25 Wrapped – Looking back at Invictus, Kaili, DRO, and more

In the first half of the HotCopper Wire‘s CY25 end-of-year special, Isaac McIntyre and Jonathon Davidson look back over the year that was
The Market Online Video

ASX Market Open: Aimless day for Aussie bourse again; Wall Street tech falls | Dec 18

ASX today – We may well end W51 without much of anything changing, considering Australian shares…

ANZ bigwigs attempt to navigate second shareholders ‘strike’ over pay report

ANZ Group is closing out CY25 with one last voting scrap among its shareholders, with a…
Work operations being built at Yoquivo by Advance Metals team.

Ready to roll: Advance expecting Yoquivo results rush to start in early January

Advance Metals is fast-approaching a busy period for reporting, with the explorer expecting a whole heaping…