Iltani is drilling at the Orient project in north Queensland.
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Drilling has commenced at the Orient silver-indium project in North Queensland
  • First drill holes at Orient West completed over the weekend
  • Samples to be submitted for assay in batches of three to four holes
  • First assay results expected towards the end of May/early June

Iltani Resources (ASX: ILT) has completed the first holes in its new drilling program at its Orient project in Herberton, North Queensland – Australia’s largest known silver-indium deposit.

Listen to the HotCopper podcast for in-depth discussions and insights on all the biggest headlines from throughout the week. On Spotify, Apple, and more.

MD, Donald Garner, confirmed the first holes at Orient West were completed over the weekend.

“Now that the drilling is underway its is going to be exciting to see what the drill rigs deliver, not only at Orient, but across the Herberton project as we drill multiple exciting target,” he said.

“We are confident that we can make up for the time we have lost and complete the drilling programs as designed.”

The start-up of drilling has followed the end of the wet season with contractor Eagle Drilling confirming that two RC rigs have been mobilised to site.

Iltani is planning to complete 115 RC drillholes for 16,000m at Orient for approximately 30,000m drilled to date in 145 drill holes.

The Orient drilling aims to infill the Orient East and Orient West resources to better define mineralisation geometry and upgrade resource categories.

The program will also look to extend the mineralisation along strike at Orient East and Orient West to increase the current resources and further define mineralisation in the “Link Zone” between Orient East and Orient West.

It will also test other targets including Orient North and Vein 1 to determine geometry, width and grade and economic potential.

Iltani is also undertaking environmental sampling to progress towards a mining lease application.

The company will also carry out preliminary drill testing of a number of targets within the larger Herberton project including Boonmoo Epithermal (seven initial RC drill holes for 1200m), Union Jack (three initial RC drill holes for 650m plus down hole EM geophysics), Isabel (13 initial diamond drill holes for 2550m) and Isabel Extended (two initial diamond drill holes for 500m), across the larger Herberton Project, totalling 1850m RC drilling and 3050m diamond drilling.

The Herberton project drilling is expected to commence subsequent to the completion of Orient drilling, in approximately four months’ time.

ILT is up 1.19% to 42.5¢. Mkt cap $32.95M.

Join the discussion: See what Hot Copper users are saying about Iltani Resources and be part of the conversations that move the markets.

The material provided in this article is for information only and should not be treated as investment advice. Viewers are encouraged to conduct their own research and consult with a certified financial advisor before making any investment decisions. For full disclaimer information, please click here.

ilt by the numbers
More From The Market Online
The ASX Today feature image with a red bear (FALL) silhouette beside The Market Link column branding.

The ASX Today: Oz market down again – ASX 200 falls for fifth straight day

The S&P/ASX 200 was lower again today, dropping 20.10 points or 0.23% to 8,766.40 and crossing…

Biome Australia files first patent application for probiotic strain

Biome Australia has filed its inaugural patent application for proprietary next generation probiotic strain BMB18.

Green & Gold Minerals commits to hunting high-grade copper, silver and indium at Copper Hills

Green & Gold Minerals is preparing to commence drilling at Copper Hills after receiving positive results…

Infinity Mining completes strategic farm-in and technical alliance in Victoria

Infinity Mining has signed a binding farm-in and jv agreement with Mining One over the Tanjil…