Image of the lithium element.
Source: Adobe Stock Images
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

Future Battery Minerals Ltd (ASX:FBM) has extended the known mineralisation of its pegmatite targets – and discovered new ones – through a program of reverse circulation drilling at the Kangaroo Hills Lithium Project (KHLP) in Western Australia.

The company was mainly testing northern targets at the project, with extension work at the Big Red target area showing northern continuity, and yielding intercepts such as 31 metres at 1.13% lithium oxide (Li2O) from 86 metres, including 20 metres at 1.43%Li2O from 88 metres; and 12 metres at 1.02% Li2O from 52 metres.

In addition to this, Future Battery Minerals identified a new crop of pegmatites – which will be named Potoroo – through step out drilling 200 metres to the north of the Big Red Extension, with intercepts including 14 metres at 1.04% Li2O from 108 metres; and 8 metres at 0.51% Li2O from 155 metres.

Managing Director and CEO Nick Rathjen said the drilling program had been worth waiting for, given what it indicated about the mineralisation at Kangaroo Hills.

“It is satisfying to have this wait validated with the demonstrated extension of the thick, shallow, high-grade Big Red mineralisation to the north and achieving the best intercept to date at the Project,” he said.

“The drilling of the Big Red Extension has also identified faulting that has altered our interpretation of Big Red’s geometry to the north.

“We believe that the larger Big Red pegmatite (inclusive of Big Red Extension) remains open to the north-east, rather than to the north-north-west coincident with the resistivity feature in this area.

“The resistivity may be highlighting shallower pegmatites in addition to Big Red, such as the newly discovered Potoroo, which will be investigated further in future drill programs.

“The newly discovered pegmatites at Potoroo are also highly significant. Not only do they extend the overall mineralised footprint of the KHLP, but they clearly represent further scale potential at the Project.”

The company is also set to kick off drilling at Big Red’s northeast extension in the next few weeks.

Future Battery Minerals has been trading at 4.9 cents.

FBM by the numbers
More From The Market Online
The Market Online Video

ASX Market Close: Index finishes flat as investors flock to safe havens | October 11, 2024

The gold price has rallied and is up more than 0.43% to $US2,645 as investors flock…
China US Aus relations concept

Week 41 Wrap: HotCopper asks “Back to Mongolia?” for Elixir; US CPI comes in at 2.4%; eyes still on China

This week on HotCopper was tumultuous for one of the community’s most hotly watched stocks: now-Australian-based…
The Market Online Video

ASX Market Update: Energy outperforms in flat trading | October 11, 2024

The local bourse is declining in alignment with the US market and in response to hotter…
AI generated uranium concept

Cauldron Energy reports “excellent” uranium assays in latest drill run

Cauldron Energy has described its latest Yanrey Uranium Project (YUP) drilling assay results as “excellent”.