The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Core Lithium (CXO) extends spodumene-bearing pegmatites at its Finniss project in the Northern Territory as it gears up for its first shipment of ore
  • The lithium explorer wrapped up a 12-hole drilling program at BP33, the second lithium mine planned at Finniss
  • While assays are pending, CXO says the visual results confirm spodumene-mineralised pegmatites below previous drilling and double the depth extent of the known pegmatite
  • Meanwhile, Core is preparing for the first shipment of Direct Shipping Ore before the end of this year after the first spodumene ore was uncovered at Grants pit earlier this month
  • Company shares are down 4.76 per cent and trading at $1.21 at 1:55 pm AEST

Core Lithium (CXO) has extended pegmatite zones at its Finniss project in the Northern Territory as it gears up for its first shipment of ore.

The lithium explorer has wrapped up a 12-hole drilling program at BP33, the second lithium mine planned at Finniss.

Drilling here began in May and results released last month included 2.27 per cent lithium oxide.

While further assays are pending, CXO said visual results for three deep diamond drill holes confirmed variable thicknesses of spodumene-mineralised pegmatites at depths below previous drilling and around 830 metres below surface.

The best result included 76 metres of highly-mineralised pegmatites interpreted to represent the down plunge extension of the main pegmatite body.

The intersections have doubled the depth extent of the pegmatite hosting the BP33 mineralisation, and Core said it expected a subsequent increase in the mineral resource estimate for the deposit.

The company has ticked off the final step to completing the approvals process for the proposed BP33 mine after submitting a Mine Management Plan to the Department of Industry, Tourism and Trade.

It follows environmental approval for the mine from the Environmental Protection Authority.

Meanwhile, Core is preparing for the first shipment of Direct Shipping Ore spodumene before the end of this year.

It comes as the first spodumene ore was uncovered at Grants pit earlier this month.

Ahead of the shipment, CXO is working to commission a crushing and screening plant.

Additionally, the company has implemented a nightshift crew to accelerate the construction of a dense media separation plant to support spodumene concentrate production in the first half 2023.

Core said there was a high level of interest in ore from Finniss and, as such, the shipment would be sold via a tender process using a digital exchange platform.

Company shares were down 4.76 per cent and trading at $1.21 at 1:55 pm AEST.

cxo by the numbers
More From The Market Online

Askari Metals welcomes Ethiopian government transition as Nejo progresses

Askari Metals has welcomed the positive administrative transition in Ethiopia where it operates the Nejo project.
The Market Online Video

Money & Investing: How to Build Wealth at Every Stage of Life

This week on Money & Investing, Mitch Olarenshaw and I discuss how to build wealth at every stage of life, from your 20s

West Cobar Metals obtains promising early results from scandium leach testwork at Salazar

West Cobar Metals has obtained positive leach testing results focused on scandium at the Salazar critical…

Noble Helium lodges application for WA exploration permit

Noble Helium has lodged an application for an onshore exploration permit to target hydrogen and helium…