Fluence Corporation (ASX:FLC) - Transitioning CEO, Henry Charrabé (left)
Transitioning CEO, Henry Charrabé (left)
Source: Perth Now
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Fluence Corporation (FLC) has secured a US$250,000 (roughly A$346,978) contract for the first Aspiral system in South Africa
  • Fluence and its local partner, MEB, will install the Smart Products Solution at a wastewater treatment plant in Kwazulu-Natal to ultimately allow the water to be reused
  • Fluence is pleased it can demonstrate the benefits of its membrane aerated biofilm reactor (MABR) wastewater treatment technology to potential customers in South Africa
  • The first phase of the project is expected to be delivered over the next eight weeks
  • Company shares are trading flat at 18.5 cents

Fluence Corporation (FLC) has secured a US$250,000 (roughly A$346,978) contract for the first Aspiral system in South Africa.

The Aspiral system includes the MABR (membrane aerated biofilm reactor) wastewater treatment technology.

The Smart Products Solution will be installed by local partner, MEB, and Fluence at one of the wastewater treatment plants in Kwazulu-Natal to process wastewater from effluent to various levels of usage. This will ultimately allow the water to be reused for safe drinking.

The solution will include an Aspiral S1 unit, ultrafiltration and reverse osmosis as well as an optional AOP system and remote supervision.

“Our local and long-term partner MEB, has signed an agreement for a pilot project with eThekwini where the Aspiral system can offer solutions to water-scarce South Africa, alleviating some of the strains on the precious and limited resource in the country,” Fluence Managing Director and CEO Henry Charrabé said.

The company considers this to be a valuable way to demonstrate the benefits of its MABR (membrane aerated biofilm reactor) wastewater treatment technology to potential customers in South Africa.

Fluence claims MABR significantly improves aerobic wastewater treatment because of its efficient nutrient removal and its energy efficiency, compared to traditional wastewater treatment systems.

The first phase of the project is expected to be delivered within eight weeks and installed in the current quarter.

Company shares are trading flat at 18.5 cents each at 12:43 pm AEST.

FLC by the numbers
More From The Market Online
Logistics

ACCC waves red flag over Dubai-based DP World’s Aus arm acquiring Silk Logistics

Silk Logistics shares have fallen 12% on Thursday as the ACCC takes issue with DP World's…
A man getting out of a Johns Lyng Group-branded yellow truck.

Downgraded: Johns Lyng price plunges after disaster repairer gets ASX 200 boot

Johns Lyng Group has seen a sharp selloff after it was confirmed the repairer would be…
Image of coins with M and A notes

Engenco tells shareholders to ‘sit on takeover offer’ from Elphinstone

Engenco Ltd has responded to an off-market takeover offer from the Elphinstone Group, telling shareholders to…
A Sydney train

Veris lands $5.15M contract for Sydney train infrastructure

Veris Ltd is building on its relationship with the Parklife Metro Consortium on the Western Sydney…