PriceSensitive

Golden Mile Resources (ASX:G88) commences RC drilling at Yarrambee

ASX News, Materials
ASX:G88      MCAP $4.523M
01 December 2021 14:46 (AEST)

Drilling at Golden Mile’s Yarrambee base metals project. Source: Golden Mile Resources

Golden Mile Resources (G88) has commenced a series of reverse circulation (RC) drilling at its Yarrambee copper, zinc and nickel project in Western Australia.

The exploration project is located in the highly prospective Goldfields region, roughly 350 kilometres southeast of Perth.

G88 has started a drilling program that will include between 2000 and 3000 metres of exploration.

Modelling of the Narndee cluster of nine drill-ready base metal targets has been considered as prospective for copper, zinc and nickel mineralisation.

The previously identified Tank anomaly was labelled as “highly conductive and extensive” after it was picked up in the recent ground surveys but not in airborne surveys.

According to the announcement, G88 invited a portable XRF analyser on-site to support the mineral identification and sampling process.

“The RC program is targeting bedrock conductors in an area where historical exploration
identified widespread alteration and base metals mineralisation,” Managing Director James Merrillees said.

“These proximal indicators coupled with our geophysical surveys have defined high potential targets for this program which is expected to take about two weeks to complete.”

Golden Mile Resources shares have climbed eight per cent and were trading at 5.4 cents a share at 2:45 pm AEDT.

Related News