Source: Hot Chili
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Hot Chili (HCH) begins a pre-feasibility study (PFS) for its Costa Fuego Project in Chili
  • The company hopes to create a globally significant copper-gold project that leverages a central processing and combined infrastructure approach
  • To lead the study, Hot Chili appoints Perth-based consultancy Wood, which will be responsible for design, planning and cost estimations
  • Hot Chili expects the study will be completed in the third quarter of 2022
  • Company shares are up 2.63 per cent and are trading at 3.9 cents

Hot Chili (HCH) has begun a pre-feasibility study (PFS) for its Costa Fuego Project in Chili.

The PFS aims to transform Hot Chili’s Productora Project’s PFS, which was completed in 2016, to create a ‘globally significant’, clean concentrate, copper-gold project that can leverage a central processing and combined infrastructure approach.

Significantly, this PFS is already starting from an advanced level as the site layout has been designed and various permitting and rights have already been secured.

Based on various studies, the Chilean project has the potential to be a large-scale, long-life open-cut and cave mining operation that uses conventional sulphide and oxide processing with strong environmental and social credentials.

When combined with the nearby Cortadera and Productora projects, the Costa Fuego Project has a resource of 724 million tonnes at 0.48 per cent copper equivalent for 2.9 million tonnes of contained copper and 2.7 million ounces of gold. This is expected to grow with another resource upgrade planned for later this year.

As part of the study, Hot Chili appointed Perth-based engineering consultancy Wood as the lead engineer.

Wood offers full in-house capabilities over the whole life cycle of a project. It has worked on over 3000 studies and 250 major projects that have been successfully designed, constructed and commissioned across over 40 countries.

The engineering company will be responsible for the Costa Fuego processing plant and infrastructure design, capital and operating cost estimation, and execution planning.

The PFS will consider a concentrator and leach throughput range of between 20 million tonnes and 30 million tonnes per annum. The study is expected to be completed in the third quarter of 2022.

Company shares were up 2.63 per cent and were trading at 3.9 cents at 11:24 am AEST.

HCH by the numbers
More From The Market Online

Patagonia grows portfolio of REE and lithium-focused territory with exploration grants

Patagonia Lithium Ltd has been granted an additional 15 exploration licences in Argentina where it is…

The curious tale of Poseidon Nickel’s restart of works at Lake Johnston

Poseidon Nickel – now a penny-stock – has announced it's restarted exploration at Lake Johnston a…

Tambourah gets state govt grant for drilling at namesake gold project in WA

Tambourah Metals Ltd is set to prioritise diamond drilling at flagship gold project in WA after…

Vulcan smashes through $5/sh resistance level as final funding stage live

Vulcan Energy Resources has been on a comeback story YTD in 2024. It's now at the…