Drilling has identified additional potential at the Lady Herial open pit.
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Thick, high-grade gold results confirm consistent mineralisation across the Lady Herial extensions
  • Standout intercepts include 16m at 9.14 g/t Au and 10m at 4.45 g/t Au
  • Structure mineralisation continues from base of completed open pit into cut-back target area
  • Northwest prospect could materially reduce strip ratio and improve cut-back economics

Lunnon Metals (ASX: LM8) has received positive indications from the company’s exploration program at the Foster-Baker gold project (FBA) in Western Australia.

The Watchlist — short video interviews with ASX leaders. Watch now.

FBA is located in the middle of the prospective St Ives gold camp, a district that has produced over 18 million ounces (Moz) of gold mined since modern production commenced in the early 1980s.

The company’s $13 million, 43,000m FY2027 drill program is advancing a balanced portfolio of early-stage conceptual targets in under-explored areas in search of a significant discovery whilst definition work is progressing more advanced near surface deposits down plunge of the recently completed first stage of mining at the Lady Herial open pit.

Results have been returned from the drilling of 25 reverse circulation (RC) holes at Lady Herial which targeted the northwest extensions of this mineralised gold system.

The program included infilling the Upper Structure, which was successfully mined in the first stage of open pit mining and the Northwest Prospect (NWP), which sits above it. Both these gold structures start from between approximately 25m and 45m below the current surface.

The program’s objective was to reduce the drill spacing on the known gold mineralisation inside the existing mineral resource, to better than an approximate 20m by 10m spacing, thereby improving geological and grade estimation confidence, and if successful, increasing the category of the mineralisation from Inferred to Indicated and potentially Indicated to Measured.

“Any potential for a cut- back at Lady Herial relies on three key parameters, the future A$ gold price assumed to prevail at the time of planned mining, the cost to remove the overburden to get to the inevitably deeper gold mineralisation and lastly, but most importantly, the grade of, and confidence in, the mineral resource estimate,” MD, Edmund Ainscough, said.

“We could not drill these holes for safety reasons during the active mining operations, so have had to sit tight and wait until mid-August to get going, but our patience was worthwhile. The highlighted intercepts on the NWP will potentially assist any open pit optimisation drive down through the overburden to the NWP, and then potentially onto the Upper Structure.

“The first stage of Lady Herial mining was a success primarily because we did such a thorough job of defining the geology and gold mineralisation, and hence de-risking the project to the greatest extent possible. The success of that approach naturally sets the template we look to follow moving forward.”

The company is looking to finalise Scoping Study analysis in early December 2026.

LM8 is up 1.59% to 32.0¢. Mkt cap $71.63M.

Join the discussion: See what HotCopper users are saying about Lunnon Metals now and be part of the conversations that move the markets.

The material provided in this article is for information only and should not be treated as investment advice. Viewers are encouraged to conduct their own research and consult with a certified financial advisor before making any investment decisions. For full disclaimer information, please click here.

lm8 by the numbers
More From The Market Online

EVE Health Group signs Australian compounding agreement for rapidly rising Men’s Health issue

EVE Health Group has signed an agreement with Optimal Pharmacy Plus Stafford aimed at the Australian…
The Market Online Video

Market Close: ASX 200 rallies as risk appetite returns, but business confidence weakens

The Australian sharemarket finished firmly higher on today, with the S&P/ASX 200 adding 106.50 points, or 1.18%, to close at 9,136.20.

Nanoveu’s EMASS signs DigiKey as Global Distributor for ECS-DoT-22

Nanoveu's wholly-owned subsidiary EMASS has signed DigiKey as its global distributor for ECS-DoT-22 system.
The Market Online Video

Wealth Within: Wall Street Tech Sinks While ASX Tech Soars

Wall Street’s technology stocks have been hammered, with the Nasdaq plunging 5.5 per cent in a single session and Nvidia falling more tha…