PriceSensitive

NewPeak Metals (ASX:NPM) progresses drilling at New Zealand gold project

Mining
ASX:NPM      MCAP $3.659M
18 December 2020 15:30 (AEDT)
NewPeak Metals (ASX:NPM) - CEO & Managing Director, David Mason

Source: Twitter

NewPeak Metals (NPM) has provided an update on its maiden drilling program at the Cap Burn Gold Project, which lies within the Otago District in New Zealand.

So far, the miner has drilled five diamond holes, for 522 metres, to test the main, large mineralised surface anomaly within the eastern area of the project.

While results are yet to be released, portable XRF analysis has identified multiple anomalous zones of more than 100 parts per million (ppm) arsenic. The anomalous values range from 100 ppm to 4202 ppm over drill intersections of up to 10 metres thick.

These intervals are generally associated with structural zones, quartz, weak silica alteration and sulphides.

“We are excited to have encountered elevated levels of arsenic at depth given that is a common feature of gold deposits along the Otago Schist Belt,” Managing Director David Mason said.

“This coupled with the size of the surface anomaly gives us the cause to be optimistic at this early stage, particularly as the drilling to date has been along the margins of the surface anomaly,” David added.

Detailed logging and processing of the diamond core is in progress and sampling is expected to be completed before Christmas. Assays are expected to start arriving at the end of January.

Once the Christmas break is over, NewPeak Metals will continue drilling in January which will focus on moving to the centre of the soil anomaly.

Company shares are trading flat at 0.3 cents at 2:22 pm AEDT.

Related News