Photo of mountains in Kazakhstan
Source: Adobe Stock
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

Sarytogan Graphite Ltd (ASX:SGA) has seen its share price plunge on the release of a prefeasibility study (PFS) for its flagship project in Kazakhstan – despite claims of exceptional returns for three different product types – with investors instead eyeing downstream operational costs of more than US$1000 per tonne.

At 13:33 AEST, the company’s shares were trading at 12 cents, a fall of 22.6% since the market opened.

The PFS outlined three potential products for the Sarytogan Graphite Project: microcrystalline graphite (with recoveries of more than 80%) at up to US$791 per tonne, ultra-high purity fines (UHPF) at up to fine nines purity, earning as much as US$5,577 per tonne, and spherical purified graphite at up to US$8,000 per tonne.

The metrics were calculated according to 10-year weighted averages, and the study also posited an initial mine life of 60 years at the maiden ore reserve of 8.6 million tonnes at 30% TGC (total graphite content), with only 4% of the mineral resource to be consumed in that time.

This, Sarytogan said, would enable multi-generational expandability for the project, whose financials also looked positive, with net present value (NPV) estimated at US$518 million, or A$797 million, and payback time estimated between 3.4 and 5.3 years, according to the mining stage.

Given the size and grades evident at the project, it was initially uncertain why the market as it did, although some investors appeared to pick up on the downstream operating costs for the life of mine (LOM) positioned at US$1,150.47 for production of UHPF.

Nevertheless, Managing Director, Sean Gregory said the PFS showed strong potential for the future operation.

“The Sarytogan Graphite Project now takes its place as a very serious contender to play an
important role in meeting the world’s energy storage needs,” he said.

“The physical attributes of the giant and exceptionally high grade Sarytogan Graphite Deposit have shone through in the PFS which envisages low costs and high margins, even at the conservative project sizing selected to minimise risk.

“Coupled with the recent planned investment by the European Bank for Reconstruction and Development strengthening of our balance sheet, Sarytogan is in a strong position to drive the project forward with early works on the DFS already underway.”

sga by the numbers
More From The Market Online

West Coast Silver identifies mineralisation in Elizabeth Hill scout drilling

West Coast Silver has identified mineralisation from surface and immediately to the north of the historical…
IPO Initial Private Offering Stock Market Ticker Building 3d Illustration

Meet the neighbours: Two new oil & gas companies launch on the ASX this week

Despite a quiet start to the year for the IPO market – despite the ASX softening listing rules in the second half of
The Market Online Video

The ASX Today: Finbro sci-fi story helps fuel AI scare trade in US; gold settles slightly, while VIX flat WoW

Greetings and welcome to HotCopper’s the ASX Today for Tuesday of Week 9, I’m Jon Davidson.

Alicanto to commence drilling at Mt Henry gold project, days after acquisition

Alicanto Minerals is fast-tracking exploration at its newly acquired Mt Henry gold project in Western Australia.