Liontown Resources (ASX:LTR) - Managing Director, David Richards
Managing Director, David Richards
Source: The Market Herald
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Liontown Resources Limited (LTR) has moved to the next stage at its Kathleen Valley Project, with work underway on a definitive feasibility study (DFS)
  • Meanwhile, Liontown has undertaken additional geotechnical and water exploration drilling to acquire data required to complete the DFS
  • Data from the holes indicate ground conditions are suitable for underground mining, while assays remain consistent with previous drilling
  • The 100-per-cent-owned Kathleen Valley Lithium-Tantalum Project is located in the northeastern Goldfields of WA
  • LTR is trading up 3.3 per cent at 47 cents

Liontown Resources (LTR) has moved to the next stage at its Kathleen Valley Lithium Project with work underway on a definitive feasibility study (DFS).

The DFS, which is scheduled for completion in Q4 2021, follows on other studies completed in late last year.

This included a pre-feasibility study (PFS) into establishing a two-million-tonne-per-annum mining operation to produce an average 350,000 tonnes per annum of spodumene concentrate for 40 years. It also involved a subsequent scoping study into the potential to undertake downstream processing on-site to produce Lithium Hydroxide or Lithium Sulphate.

Liontown has appointed consulting groups, including Lycopodium Minerals (Process Engineering), Snowden Mining Industry Consultants (Mine Engineering) and Knight Piésold (Tailings and Hydrogeological Engineering) to assist with the DFS.

The drilling continues

Meanwhile, the company has undertaken additional geotechnical and water exploration drilling to acquire data identified by the 2020 PFS, which is required to complete the DFS.

The geotechnical drilling comprises six diamond core holes totalling 1312 metres and was designed to provide rock quality data for the proposed underground portals and the north-western part of the deposit. Data from the holes indicate ground conditions suitable for underground mining and are consistent with previous drilling.

Two of the geotechnical holes, KVDD0076 and KVDD0077, drilled into an inferred part of the mineral resource and intersected significant widths of high-grade lithium mineralisation, confirming the continuity of the system.

The 100-per-cent-owned Kathleen Valley Lithium-Tantalum Project is located in the northeastern Goldfields of Western Australia. The site is approximately 400 kilometres north of Kalgoorlie and is proximate to well-established transport and energy infrastructure.

Liontown acquired the project in 2017.

LTR is trading up 3.3 per cent at 47 cents at 10:25 am AEDT.

LTR by the numbers
More From The Market Online
Image of a lithium brine project

Pantera begins drilling of maiden test well at Smackover

Pantera Minerals Ltd has commenced drilling of its first test well at the Smackover Lithium Brine…
The Market Online Video

Rick Rule looks ahead to U.S. election’s outcome and impact on energy

Rick Rule, president and CEO of Rule Investment Media, joins The Market Online in the above video to share his
Image representing the stock market

Yancoal Australia reports strong Q3 financials

Yancoal Australia (ASX:YAL) has reported strong Q3 financial results, revealing the company had a cash balance increase of $430...
Golden bars in a mine

Australian Gold and Copper reports high grade results at Achilles

Australian Gold and Copper (ASX:AGC) has reported high-grade results from its Achilles discovery in central NSW.