The Auger Test Rig. Source: Agrimin
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Agrimin Limited (AMN) has completed the required site-based Front End Engineering Design (FEED) testwork to support Royal IHC’s comprehensive design for automated wet harvesting equipment for the Mackay Potash Project
  • The use of wet harvesting at the Mackay Potash Project can provide significant operating benefits, including lower energy consumption, reduced labour costs and increased overall potassium recovery
  • Because the mineralogy mix is equivalent to that expected during commercial operations, these minerals supplied a high-quality, representative substrate for pilot-scale testing of the wet harvesting equipment design
  • Agrimin Limited shares have remained steady, trading at 43 cents at 2:43 pm AEDT

Agrimin Limited (AMN) has completed the required site-based Front End Engineering Design (FEED) testwork to support Royal IHC’s comprehensive design for automated wet harvesting equipment for the Mackay Potash Project.

Mackay Potash Project is around 785km from the Port of Wyndham in Western Australia and, according to the company, is forecast to be one of the world’s lowest-cost producers of Sulphate of Potash (SOP).

Agrimin has now completed a full testwork program within the pilot evaporation ponds located on Lake Mackay as part of the FEED works connected to the wet harvesting equipment.

The use of wet harvesting at the Mackay Potash Project can provide significant operating benefits, including lower energy consumption, reduced labour costs and increased overall potassium recovery.

The pilot evaporation ponds were operated under steady-state conditions for a sufficient amount of time during the Definitive Feasibility Study phase to develop a thick bed of salt minerals in the ponds.

Because the mineralogy mix is equivalent to that expected during commercial operations, these minerals supplied a high-quality, representative substrate for pilot-scale testing of the wet harvesting equipment design.

The next step is to complete and deliver design drawings for all key areas of the equipment.

The preliminary phase continues to advance with multiple work streams underway, in parallel with finalising the Project’s approvals, offtake and financing.

Agrimin Limited shares have remained steady, trading at 43 cents at 2:43 pm AEDT.

More From The Market Online

Listen: HotCopper Wire Podcast #047 – Maybe just send an email next time, Albo

In this week’s HotCopper Wire episode, Isaac McIntyre and Jonathon Davidson break down (poke holes in) Albo’s national address from 7PM Wednesday, talk
The Market Online Video

Introducing Prairie Lithium: Saskatchewan’s permitted lithium project ready to scale

We've spoken to Prairie Lithium founder Zach Maurer about the explorer's overall mission, right after Macquarie's…
The Market Online Video

US growth, injectable iron pipeline: How AFT Pharma is driving toward $300 million by FY27

AFT Pharmaceuticals (ASX:AFP) is in a red-hot position as we head straight into FY26’s fourth quarter in Australia, and
The Market Online graphic with ASX-branded charts and the text "HotCopper Highlights" centred in white.

HotCopper Highlights, Week 15: Santos, Karoon, Viva all riding the Iran-fuelled Energy rollercoaster

Hello, hello, and welcome to HotCopper Highlights for Week 15, CY26, I’m Isaac McIntyre.