Ardea Resources (ASX:ARL) - Managing Director, Andrew Penkethman
Managing Director, Andrew Penkethman
Source: Ardea Resources
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Ardea Resources (ARL) has reported that all diamond holes drilled at its Emu Lake project in WA intersected nickel sulphide mineralisation
  • The company completed two drill programs which included a combined 11 holes at the Binti prospect to follow up on the high-grade mineralisation discovered in January
  • The first of the two programs discovered the Binto Central prospect where massive sulphide mineralisation was found
  • Ardea plans to use the visual, assay and subsequent survey results to update the geological model and to help plan further exploration
  • Shares closed flat at 90 cents

Ardea Resources (ARL) has announced that all 11 diamond holes drilled at its Emu Lake project in WA intersected nickel sulphide mineralisation.

Between March and September this year, the company drilled seven diamond holes and four extensions to historical diamond holes across two drill programs.

All but one of the holes were drilled to test targets at the Binti prospect after high-grade mineralisation was discovered at Bindi South at the start of the year.

Drilling from the first program resulted in the discovery of the Binti Central prospect which lies 300 metres northwest of Binti South.

All holes intersected massive nickel sulphide mineralisation in the Central and Western ultramafics at Binti Central. Drilling in the second program also intersected nickel sulphides at both the Binti Central and Binti South areas.

Managing Director Andrew Penkethman was pleased with the results from all drill holes.

“All drill holes have intersected nickel sulphide mineralisation and demonstrated the potential for both high grade massive nickel sulphides and disseminated nickel sulphides and reinforced the prospectivity of the underexplored ultramafic sequences within Ardea’s tenure in the Kurnalpi terrane,” Mr Penkethman said.

Ardea also recently received visual, assay and survey work results which it will use to update the geological model and plan follow-up exploration work at Binti, as well as to generate nickel sulphide targets across the broader Emu Lake project.

Ardea shares closed flat at 90 cents each.

arl by the numbers
More From The Market Online

Forrestania Resources delivers first gold ore into Edna May crusher in WA

Forrestania Resources is on target for an early Christmas present with further progress with the development…
The Market Online Video

Market Open: Global sell-off deepens as nearly US$9 trillion wiped from sharemarket values

Global markets are heading into a new week under pressure after Wall Street suffered one of its worst weekly performances in years, with
Aerial shot of works on-site at Mumbezhi Copper Project, Zambia

Why Prospect Resources’ (ASX:PSC) Mumbezhi Copper Project is worth keeping eyes on

ASX-listed Prospect Resources’ (ASX: PSC) Mumbezhi Project is a promising copper opportunity, with gold and cobalt by-products, in Zambia’s North-Western Province, and one worth

Highland Metals identifies significant tin potential across Uis project with new review

Highland Metals is set to follow-up tin potential confirmed in a review of previously reported exploration…