Magnetite Mines (ASX:MGT) - CEO, Tim Dobson
CEO, Tim Dobson
Source: Tim Dobson/LinkedIn
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Magnetite Mines (MGT) completes a JORC 2012-compliant mineral resource estimate (MRE) for its Muster Dam iron ore project in South Australia
  • The inferred MRE reads 1.55 billion tonnes at 18.7 per cent iron and a 15.2 per cent mass recovery, increasing the company’s global MRE to 5.74 billion tonnes
  • The updated resource comes a few months after MGT secured Muster Dam which it considered to be a “natural complement” to its nearby Razorback project
  • Magnetite Mines plans to conduct exploration at Muster Dam while it continues developing Razorback
  • Company shares are up 6.25 per cent to trade at 1.7 cents at 2:30 pm AEDT

Magnetite Mines (MGT) has delivered a JORC 2012-compliant mineral resource estimate (MRE) for its Muster Dam iron ore project in South Australia.

The inferred MRE reads 1.55 billion tonnes at 18.7 per cent iron and a 15.2 per cent mass recovery.

The completed MRE increases Magnetite Mines’ global inferred and indicated mineral resources from 4.19 billion tonnes to 5.74 billion tonnes, making it the holder of the largest mineral resource in the Braemar Iron Formation.

Magnetite Mines secured the Muster Dam tenement in May this year, as it is near the company’s Razorback iron ore project and has similar geophysical and geochemical characteristics.

The company considered the tenement to be an important opportunity as well as a “natural complement” to the Razorback project which lies 110 kilometres away.

Muster Dam is made up of the Muster Dam, Surrender Dam, Duffields and Peaked Hill prospects, however the company prefaced that the updated MRE applied to the Muster Dam prospect within the EL6746 tenement only.

Magnetite Mines said the Peaked Hill, Duffields and Surrender Dam prospects have shown “significant prospectivity” from previous drilling and geophysical surveys.

Moving forward, the company intends to prioritise exploration at these areas while it continues to develop its Razorback project.

Company shares were up 6.25 per cent to trade at 1.7 cents at 2:30 pm AEDT.

MGT by the numbers
More From The Market Online
The Market Online Video

HotCopper Highlights, Week 50: 4DX above $2/sh, Nanoveu, Ovanti & more

Good Afternoon and welcome to HotCopper Highlights wrapping up Week 50 of the year, I’m Jon Davidson.

‘Potential is enormous’: GreenX likes what it’s found in Tannenberg, is activating acquisition option

GreenX Metals has activated an option to secure control of the Tannenberg Copper Project in Germany,…
The Market Online Video

ASX Market Open: Oz shares heading for W50 weekly gains with Friday rally | Dec 12

ASX today – The third-last week of CY25 may actually end on gains, with a late-on…

Listen: HotCopper Wire CY25 Wrapped – Looking back at Invictus, Kaili, DRO, and more

In the first half of the HotCopper Wire‘s CY25 end-of-year special, Isaac McIntyre and Jonathon Davidson look back over the year that was