Altech 1 MWh GridPacks. Source: Altech Batteries
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Altech Batteries (ATC) launches production and fabrication of two 60KWh battery pack prototypes at the Fraunhofer IKTS facility in Germany
  • Once completed, the battery packs will undergo cycling testing under extreme conditions, before becoming available for testing at customer premises
  • The design for the CERENERGY sodium chloride solid state (SCSS) 60 KWh battery pack was launched by Altech and joint venture partner Fraunhofer in November 2022
  • The production process will manufacture 480 ceramic solid-state cells and source auxiliary equipment, including cabling, module structures, composite isolation cabinet, and a battery management system
  • Shares in ATC are up 5.32 per cent and trading at 9.9 cents at midday AEST

Altech Batteries (ATC) has begun production and fabrication of two 60 kilowatt hour (KWh) battery pack prototypes at the Fraunhofer IKTS facility in Hermsdorf, Germany.

Once completed, the battery packs will undergo cycling testing under extreme conditions, and then become available for testing at customer premises.

The battery pack operates on a voltage of 600 volts at a current of 100 amps, and is destined for the renewable energy and grid storage markets.

The design for the CERENERGY sodium chloride solid state (SCSS) 60 KWh battery pack was launched by Altech and its joint venture partner Fraunhofer on November 7 2022.

Following the launch, the joint venture carried out extensive cycling simulations to evaluate the temperature profile of the internal components of the battery.

The simulations showed the battery could undergo charge and discharge cycling while maintaining stable internal temperatures without overheating at recorded temperatures of 60 degrees.

Altech Managing Director Iggy Tan said he was “pleased” with the company’s progress since launching the battery pack.

“We have built a dynamic and fast-moving project team incorporating personnel from Altech, Fraunhofer and various leading German engineering companies and industrial contractors.”

The company reported that based on the simulation results, the specifications for the battery packs were being finalised, and the materials required for the production of two prototype batteries ordered.

The production process will involve the manufacture of 480 ceramic solid-state cells, along with the production and procurement of auxiliary equipment including cabling, module structures, composite isolation cabinet, and a battery management system.

Shares in ATC were up 5.32 per cent and trading at 9.9 cents at midday AEST.

ATC by the numbers
More From The Market Online
The Market Online Video

ASX Market Close: IT stocks drag index lower | January 15, 2025

The local bourse gave up early gains and slipped into the red in afternoon trade, and…
Image of gold chips

Great Boulder de-risks Side Well project with 98.7% gold recovery for Mulga Bill

Great Boulder Resources Ltd has shown that high gold recoveries with moderate levels of cyanide consumption…
Lithium ion battery with the Brazilian flag

Gold Mountain shares up 50% on drill target definition at Salinas II lithium play

Gold Mountain Resources Ltd has recorded a strong share market performance on the news based on…
The Market Online Video

ASX Market Update: Bourse inches higher after paring gains | January 15, 2025

The Discretionary sector has been leading the market higher, up 0.6%, followed by Real Estate, up…