A dozer preparing access tracks and drill pads at the Chubb project in Canada. Source: Burley Minerals
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Burley Minerals (BUR) intercepts high-grade results from its first round of assays at its Chubb lithium project in Quebec, Canada
  • Assays from the first three holes of the maiden drilling program include 8.2 metres at 1.31 per cent lithium oxide from 130.4 metres, and 7.7 metres at 1.30 per cent lithium oxide from 80.1 metres
  • Burley commenced drilling in April, with 14 diamond core holes completed to date
  • Meanwhile, the company is planning to finalise the acquisition of the Bouvier lithium project, located 14 kilometres northwest of the Chubb project
  • Shares were down 14 per cent to 21.5 cents at 4:00 pm AEST

Burley Minerals (BUR) has intercepted high-grade results from its first round of drilling at its Chubb lithium project in Quebec, Canada.

Results from the first three holes of the maiden drill program included 8.2 metres at 1.31 per cent lithium oxide from 130.4 metres, including 4.2 metres at 1.93 per cent lithium oxide, and 7.7 metres at 1.3 per cent lithium oxide from 80.1 metres.

The assays also confirmed visual observation of spodumene, a prime lithium mineral, in the pegmatites.

“The receipt of such highly encouraging results in such a short period of time is a major milestone for Burley Minerals following the recent acquisition of the Chubb lithium project in February this year,” Burley Minerals Chairman Bryan Dixon said.

“The new drilling intersections build on a high-grade spodumene zone identified in mapping and subsequently in drilling undertaken in 2021 and 2022, and the company is eagerly anticipating the remaining assay results from the current program during June.”

Burley commenced drilling in April, completing 14 diamond core holes to date, with the program set to resume later in June.

Meanwhile, the company is planning to push ahead with the acquisition of the Bouvier lithium project, located 14 kilometres northwest of the Chubb project.

Burley was down 14 per cent, trading at 21.5 cents at 4:00 pm AEST.

BUR by the numbers
More From The Market Online
The Market Online Video

Market Close: ASX Ltd drops on ASIC $150M raise request; iron ore offsets gold bounceback

Good Afternoon and welcome to Market Close for Monday of Week 51, I’m Jon Davidson.
HotCopper Daily Market Trends Graphic

Monday’s HotCopper trends: Winsome, 4D Medical, and other daily topics | Dec 15

With more than seven million users on the HotCopper forums, every discussion and speculation can move Australian markets, which is why getting out in front
A dirt road running through the Antimony Canyon project in Utah.

American Tungsten and Antimony leaves ‘Trigg’ name behind to start next era (and set fresh focus)

American Tungsten and Antimony has entered a new era, leaving the name "Trigg Minerals" behind to…
The Market Online Video

How to manage money on the average Aussie income

This week on Money and Investing, Mitch Olarenshaw and I break down how to manage money on the average Australian income, using practical