Image of James Bay region in Quebec
Source: Adobe Stock
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

Canada-focused lithium player Winsome Resources Ltd (ASX:WR1) has released a scoping study for its Adina project in Quebec which proposes 17 years of active production at a rate of 280,000 tonnes of spodumene per annum, and an overall life of mine (LOM) set at 21 years.

But Winsome maintains that it is the cost parameters which would make Adina – located in the Eeyou Istchee James Bay region – one of the most capital efficient new lithium projects in North America.

This begins with the fact that existing infrastructure connected to the Renard diamond mine 60 kilometres south of Adina is still in place, keeping start-up capital costs relatively low at US$260 million.

Additionally, Winsome says that C1 operating costs are expected to average US$598 per tonne /t across the active production period, while all-in sustaining costs across the same period should average US$693 per tonne.

This would set the estimated payback period at 1.8 years.

Managing director Chris Evan said this data provided high expectations for the project, outlining a clear path to production.

“The detailed inputs to this Scoping Study mean it provides a robust basis from which to advance the development of Adina,” he said.

“In particular the outcome that the existing and well-maintained Renard facility can be repurposed for a relatively modest Start Up Capital Cost to develop our hard-rock spodumene resource is a major benefit.

“Importantly it offers a significant commercial advantage that will see the facility operate
through market fluctuations and commodity cycles.

“The ease of mining mineralised material at Adina via an initial low strip open pit along with the simple DMS flowsheet results in a competitive operating cost estimate which optimisation may improve further.”

In April this year, Winsome told investors it had an exclusive option to purchase the Renard project, which includes a processing facility and associated infratructure.

Winsome shares have risen on the news. At 12:43 AEST, they were trading at 52.5 cents – a rise of 0.96% since the market opened.

WR1 by the numbers
More From The Market Online
Market Close Graphic

ASX Market Close: Bourse hits new all time record, and stronger than expected jobs data | September 19, 2024

The ASX200 closed up 0.61% at 8,192 points after breaking its all-time record in intra-day trade.
The Market Online Video

Essential Energy conference: Elixir talks up QLD’s Taroom Trough

Elixir Energy Ltd's managing director Neil Young was speaking at RIU's Essential Energy conference in Perth
Market Update Graphic

ASX Market Update: Jobs data stronger than expected as Index touches intra-day record | September 19, 2024

The ASX200 hit a new all time high of 8,186 points in the first half hour…
Artwork of a bird surrounded by flames

Firetail executive changes set to propel development in Canada and Peru

Firetail Resources Ltd has appointed former CEO Glenn Poole as managing director, while Brett Grosvenor has…