Alpha HPA (ASX:A4N) - Managing Director, Rimas Kairaitis
Managing Director, Rimas Kairaitis
Source: Finance News Network
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Alpha HPA (A4N) has received a large test sample order from a U.S. sapphire glass and LED manufacturer for its high purity alumina product
  • Alpha is developing its HPA First Project into a 10,000 tonnes per annum facility to supply the lithium ion battery, sapphire glass and LED light markets
  • To meet the large sample order, Alpha is preparing an increased volume demonstration scale run at HPA First
  • Additionally, the company is conducting project financing and permitting discussions as well as engineering activities
  • Alpha is down 6.06 per cent with shares trading for 15.5 cents each

Alpha HPA (A4N) has provided an update on activities at its HPA First Project.

The company is utilising the project to produce up to 10,000 tonnes per annum of high purity alumina (HPA). Alpha will do this by sourcing its proprietary licensed solvent extraction (SX) and HPA refining technology.

Alpha’s technology allows for the extraction and purification of aluminium from industrial feedstock to produce alumina for the lithium ion battery, sapphire glass, and LED lighting industries.

Alpha has received a 90 kilogram test sample order from a U.S.-based sapphire glass and LED manufacturer. This order follows a standing order from a South Korean-based sapphire glass and LED manufacturer.

The company is pleased to have secured these orders as it has been actively pursuing outreach activities into the glass and LED industry.

“We are very encouraged to now be receiving test sample HPA orders from the sapphire glass/LED industry as our market outreach work into this sector begins to expand,” Managing Director Rimas Kairaitis said.

To meet the larger sample order, Alpha is preparing an increased volume demonstration scale run at the HPA First Pilot Plant. The relevant pre-cursor circuit and existing drying and calcination circuits are already scaled to meet the larger volume.

Alpha is currently working with KPMG Debt Advisory Team to organise financing for the HPA First Project. The company is also in advanced stages of engineering and by-product activities.

The company is continuing to progress key steps for project permitting under the guidance of external consultants, AECOM.

Alpha is down 6.06 per cent with shares trading for 15.5 cents each at market close.

A4N by the numbers
More From The Market Online

Patagonia grows portfolio of REE and lithium-focused territory with exploration grants

Patagonia Lithium Ltd has been granted an additional 15 exploration licences in Argentina where it is…

The curious tale of Poseidon Nickel’s restart of works at Lake Johnston

Poseidon Nickel – now a penny-stock – has announced it's restarted exploration at Lake Johnston a…

Tambourah gets state govt grant for drilling at namesake gold project in WA

Tambourah Metals Ltd is set to prioritise diamond drilling at flagship gold project in WA after…

Vulcan smashes through $5/sh resistance level as final funding stage live

Vulcan Energy Resources has been on a comeback story YTD in 2024. It's now at the…