Galan Lithium (ASX:GLN) - MD, Juan Pablo Vargas de la Vega
MD, Juan Pablo Vargas de la Vega
Source: Galan Lithium
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Galan Lithium (GLN) receives government permits from the Ministra – Ministerio de Mineria (Mine Minister) to advance its Hombre Muerto West (HMW) project in Argentina
  • The granting of these permits are essential for the company to build its stage one pilot plant and new camp accommodation at the lithium brine project
  • Galan says the permits are critical to feasibility work and it’s eager to enter “an exciting new phase as we cement the development phase of our flagship project”
  • Company shares are up 9.52 per cent to trade at $1.38

Galan Lithium (GLN) has received government permits from the Ministra – Ministerio de Mineria (Mine Minister) in Argentina’s Catamarca province.

These permits are essential for Galan to build its stage one pilot plant and new camp accommodation at its flagship Hombre Muerto West (HMW) lithium brine project which lies within the Hombre Muerto West salt flat in the South American Lithium Triangle.

The permit approvals follow the company progressing feasibility work which involved completing the first of its small scale evaporation ponds at HMW. Galan is now measuring evaporation rates which are essential for the feasibility study.

Managing Director Juan Pablo (JP) Vargas de le Vega commented on the government permit approvals.

“These permits were critical path items for the robustness of the HMW feasibility study and the pace at which it now moves forward,” Managing Director Juan Pablo Vargas de le Vega said.

“Galan wishes to extend its heartfelt thanks to the Minister and the Government for the grant of the permits in these trying times. Our company is entering an exciting new phase as we cement the development phase of our flagship project in Argentina.”

Now the permits have been granted and the entire Galan project team has mobilised to Argentina, the company will advance the pilot plant and new camp construction activities.

In addition to HMW, Galan Lithium is progressing a scoping study for the Candelas project and expects study results before the end of the year.

Company shares were up 9.52 per cent to trade at $1.38 at 11:46 am AEDT.

GLN by the numbers
More From The Market Online

EV Resources on ‘accelerated pathway’ to Los Lirios restart after strong antimony recovery tests

EV Resources is inching closer to a Los Lirios restart after strong metallurgical results set up…
Diamond drilling at Bankan.

‘Inferior’: Perseus backs down on Predictive merger – but not without swipe at Robex

Perseus Mining has thumbed its nose at Robex as it heads out the door, stepping away…
A dirt road running through the Antimony Canyon project in Utah.

American Tungsten and Antimony leaves ‘Trigg’ name behind to start next era (and set fresh focus)

American Tungsten and Antimony has entered a new era, leaving the name "Trigg Minerals" behind to…
Drill rig concept

EV Resources kicking off maiden drilling for antimony at Los Lirios, Mexico

EV Resources is geared up for a maiden drilling run right out the gate into 2026…