Source: Kairos Minerals
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Kairos Minerals (KAI) has identified four gold targets at its Kangan Project in WA’s Pilbara region
  • Among the new targets is a large gold target, which sits in a favourable geological position for potential intrusive-hosted gold discoveries
  • Kairos is now planning a round of aircore drilling at the Kangan, to further test these new targets
  • Additionally, the company has wrapped up reverse circulation (RC) drilling at its Fuego prospect at the Croydon Project
  • It’s sent over 300 samples for testing and is now preparing to move the drill rig to its Mt York Project
  • Shares in Kairos are trading 8.2 per cent higher at 6.6 cents each

Exploration company Kairos Minerals (KAI) has released an activities update, revealing that four new four gold targets have been identified at its Kangan Project.

Kangan

Kangan is located in around 20 kilometres southeast of the new Hemi gold discovery owned by De Grey Mining (DEG) in WA’s Pilbara region.

Kairos has recently carried out a geochemical sampling program at the site, along with an aeromagnetic survey to identify any targets.

After receiving back the results, the company has narrowed in on four targets — including a large gold target, which sits in a favourable geological position for potential intrusive-hosted gold discoveries.

In light of the new discoveries, Kairos has decided to prioritise an initial aircore drilling program to test all of the targets at Kangan. It expects the drilling to begin sometime in the next quarter.

Croydon & York

Additionally, Kairos also notified shareholders in today’s update that reverse circulation (RC) drilling at the Croydon Project has been completed.

The company drilled eight RC holes over the Fuego prospect within Croydon, with 1424 metres drilled and 365 samples sent off.

Kairos expects to receive the results from the first batch of samples by the end of this month.

It’s also planning to send the drill from Croydon to the Mt York project area, where
more RC drilling is planned.

In particular, the rig will drill extensions of the Mt York, Iron Stirrup and Old Faithful deposits.

“Our systematic approach to exploration across the Pilbara Gold Project is continuing to generate results across a number of fronts,” Kairos Executive Chairman Terry Topping said.

Shares in Kairos are trading 8.2 per cent higher at 6.6 cents each at 10:55 am AEST.

kai by the numbers
More From The Market Online

MAX Power Mining: Could Natural Hydrogen Help Power the Next Generation of AI?

As artificial intelligence drives demand for computing power, MAX Power Mining Corp.
The Market Online Video

Haranga’s New MD & CEO on Unlocking Value at the Lincoln Gold Project

Haranga Resources (ASX: HAR) has appointed Patrick Mootz as its new Managing Director and CEO, bringing extensive mining development and operational experience
The Market Online Video

iTech Minerals: New Gold Shoot adds to Sabre prospect potential

iTech Minerals (ASX: ITM) is finding more gold and antimony at depth at its Sabre project in the Northern Territory, with drilling
The Market Online Video

Kaoko Metals: First Chalkos drilling confirms shallow copper-silver mineralisation

Kaoko Metals (ASX: KAO) Managing Director Gerard O’Donovan joins The Watchlist to discuss the first assay results from the company’s maiden drilling