Liontown Resources (ASX:LTR) - Managing Director, David Richards
Managing Director, David Richards
Source: The Market Herald
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Liontown Resources Limited (LTR) has moved to the next stage at its Kathleen Valley Project, with work underway on a definitive feasibility study (DFS)
  • Meanwhile, Liontown has undertaken additional geotechnical and water exploration drilling to acquire data required to complete the DFS
  • Data from the holes indicate ground conditions are suitable for underground mining, while assays remain consistent with previous drilling
  • The 100-per-cent-owned Kathleen Valley Lithium-Tantalum Project is located in the northeastern Goldfields of WA
  • LTR is trading up 3.3 per cent at 47 cents

Liontown Resources (LTR) has moved to the next stage at its Kathleen Valley Lithium Project with work underway on a definitive feasibility study (DFS).

The DFS, which is scheduled for completion in Q4 2021, follows on other studies completed in late last year.

This included a pre-feasibility study (PFS) into establishing a two-million-tonne-per-annum mining operation to produce an average 350,000 tonnes per annum of spodumene concentrate for 40 years. It also involved a subsequent scoping study into the potential to undertake downstream processing on-site to produce Lithium Hydroxide or Lithium Sulphate.

Liontown has appointed consulting groups, including Lycopodium Minerals (Process Engineering), Snowden Mining Industry Consultants (Mine Engineering) and Knight Piésold (Tailings and Hydrogeological Engineering) to assist with the DFS.

The drilling continues

Meanwhile, the company has undertaken additional geotechnical and water exploration drilling to acquire data identified by the 2020 PFS, which is required to complete the DFS.

The geotechnical drilling comprises six diamond core holes totalling 1312 metres and was designed to provide rock quality data for the proposed underground portals and the north-western part of the deposit. Data from the holes indicate ground conditions suitable for underground mining and are consistent with previous drilling.

Two of the geotechnical holes, KVDD0076 and KVDD0077, drilled into an inferred part of the mineral resource and intersected significant widths of high-grade lithium mineralisation, confirming the continuity of the system.

The 100-per-cent-owned Kathleen Valley Lithium-Tantalum Project is located in the northeastern Goldfields of Western Australia. The site is approximately 400 kilometres north of Kalgoorlie and is proximate to well-established transport and energy infrastructure.

Liontown acquired the project in 2017.

LTR is trading up 3.3 per cent at 47 cents at 10:25 am AEDT.

ltr by the numbers
More From The Market Online
The Market Online Video

Northstone Resources: Record-grade drilling intercept raises the stakes ahead of maiden JORC resource

Northstone Resources (ASX: NRL) has hit 36m at 5.85g/t AuEq at its Tlamino project in Serbia, significantly exceedin…
The Market Online Video

Capital Limited Expands in Australia as Revenue Growth Drives Upgraded Guidance

Capital Limited (LSE:CAPD) is strengthening its position in the global mining services sector, combining expansion into Australia with larger drilling contracts and growing
The Market Online Video

OR3 delivers maiden 153,000oz gold resource at Coolgardie

Ore Resources (ASX: OR3) has delivered its first mineral resource estimate at the Coolgardie Gold Project in Western Australia, marking a key
The Market Online Video

Diablo Resources: Copper and Gold add new potential at Utah Tungsten Prospect

Diablo Resources (ASX: DBO) is uncovering a broader mineralisation story at its Cupric prospect in Utah, where recent sampling has identified copper