Sunrise at drilling camp. Source: Melbana
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Melbana Energy (MAY) completes a final flow test of lighter oil to the surface at the Alameda-2 appraisal well in its Cuban gas project
  • Peak flows to the surface result in 1903 barrels of oil (BOE) per day from unit 1B at an average and stabilised flow rate of 1235 BOE per day
  • Melbana is developing a field plan for its tenement of wells, known as Block 9, and it’s reviewing the recent testing results to accelerate quicker production
  • The next appraisal well Alameda-3 will test the lower two geologically independent oil-bearing formations intercepted at Alameda-1
  • MAY shares were up 41.9 per cent, trading at 8.8 cents at 1:25 pm AEST

Melbana Energy (MAY) has successfully conducted a final flow test of lighter oil to the surface at the Alameda-2 appraisal well in its Cuban gas project.

The peak flow to the surface resulted in 1,903 barrels of oil (BOE) per day from unit 1B, with an average stabilised flow rate of 1,235 BOE per day.

During the testing, more than 1000 barrels of oil were produced and transported away.

“Unit 1B has really delivered, as we hoped would be the case given the high fracture density and excellent permeability and porosity we observed in the logs when drilling through that unit,” MAY Executive Chair Andrew Purcell said.

“To recap, the Alameda-2 appraisal well produced oil to the surface from Unit 1A, achieved strong flow rates of a higher quality crude from Unit 1B, proved the existence of moveable oil from Unit 3 and confirmed a significant increase in logged Net Pay to 615 metres TVD (with fractures) for the Amistad sheet in total – about 45 per cent of the gross section.

“We’re also now reassessing whether there may be value in not abandoning Alameda-1, which is the current plan, before commencing Alameda-3 to appraise the two deeper intervals.”

Melbana has developed a field plan for its tenement of wells, known as Block 9, and is reviewing the recent testing results to support the potential to accelerate the project into quicker production.

The next appraisal well, Alameda-3, will test the lower two geologically independent oil-bearing formations intercepted at Alameda-1.

MAY shares were up 41.9 per cent, trading at 8.8 cents at 1:25 pm AEST.

MAY by the numbers
More From The Market Online
The Market Online Video

ASX Market Close: Bourse finishes week on a high as Wisetech pummeled | November 22, 2024

The ASX200 closed up 0.85% at 8,393 points. Economists increasingly expect interest rates in Australia won’t…
The Market Online Video

HotCopper Highlights: Your most watched stocks for Week 47, 2024

In this segment we’ll look at the top stocks HotCopper users have been watching, and discussing,…
Nuclear explosion mushroom cloud concept

Week 47 Wrap: HotCopper users’ most watched; Brent lifts on Putin’s scary letter; RFK dents CSL

Welcome to the end of another week. Let's start with what HotCopper users have been watching…
Dale Gillham's photo, and wording 'Words from Wealth Within's Chief Analyst Dale Gillham.

Dale Gillham’s weekly wrap: Sigma-Chemist Warehouse merger creates pharma powerhouse

The $8.8 billion dollar merger between Sigma Healthcare and Chemist Warehouse is poised to reshape the Australian pharmacy landscape, consolidating power in th…