Prospect Resources (ASX:PSC) - Managing Director, Sam Hosack
Managing Director, Sam Hosack
Source: Prospect Resources
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Prospect Resources (PSC) has completed roughly 70 per cent of engineering, procurement and construction works at its Arcadia Pilot Plant in Zimbabwe
  • The Perth-based lithium company says it is on track to deliver the first shipment of high-purity petalite by the end of the second quarter this year
  • To date, the detailed engineering design and procurement at the site are complete
  • Meanwhile, around 90 per cent of the plant’s non-process infrastructure has been completed, alongside 75 per cent of the power supply and modular equipment pre-assembly
  • PSC expects to arrive at several more key milestones this quarter, including achieving operational power onsite and commencing production and transportation of its high-purity petalite product to port
  • Prospect Resources shares last traded at 16 cents each

Prospect Resources (PSC) has completed roughly 70 per cent of the engineering, procurement and construction works at its Arcadia Pilot Plant in Zimbabwe.

The Perth-based lithium company says it’s on schedule to deliver the first shipment of high-purity petalite by the end of the second quarter this year.

To date, all of the detailed engineering design and procurement at the site has been completed.

Meanwhile, around 90 per cent of the plant’s non-process infrastructure has been completed, alongside 75 per cent of the power supply and modular equipment pre-assembly.

Prospect Resources Managing Director Sam Hosack commented on the progress at Arcadia.

“The pilot plant forms a critical part of our project development and market integration strategies and we look forward to providing key customers with a high-value petalite product to complete their qualification requirements,” Sam said.

“Prospect is generating spodumene samples via an experienced third-party laboratory, as downstream lithium chemical customers only require two-kilogram spodumene samples to qualify,” he added.

PSC expects to arrive at several more key milestones this quarter, including achieving operational power onsite and commencing production and transportation of its high-purity petalite product to port.

Prospect Resources shares last traded at 16 cents each at 10:09 am AEST.

PSC by the numbers
More From The Market Online

Great Western launches government-backed drill run for copper in WA

Great Western Exploration announced on Tuesday the company has officially kicked off a drill-run on the…

Antipa finds shallow gold grading more than 15 g/t at Minyari

Antipa Minerals Ltd has picked up gold intersections grading more than 15 grams per tonne at…

Barton kicks off drilling on-site historical Tarcoola gold play

Barton Gold (ASX:BGD) has announced it's commenced drilling on-site the historical Tarcoola Goldfield project

BHP fails to secure second takeover offer to Anglo American

BHP Group Ltd has failed in a second bid to takeover Anglo American Plc through a…