ActivEX (ASX:AIV) - Managing Director, Mark Derriman
Managing Director, Mark Derriman
Source: Mark Derriman/LinkedIn
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • ActivEX (AIV) intersects up to 34.6 g/t gold from the Mt Hogan historical gold mine within its Gilberton gold project in North Queensland
  • Reverse circulation drilling was completed to test the extent of the known gold mineralisation at depth and along strike extensions
  • Initial results saw a peak intersection of four metres at 12 g/t gold including one metre at 38.5 g/t gold, with today’s results providing additional high-grade intersections
  • The company says the results leave it on track to meet its goal of further defining the multiple gold lode system at the Mt Hogan mine
  • ActivEX has ended the day 14.3 per cent in the green with shares trading at four cents

ActivEX (AIV) has intersected up to 34.6 grams per tonne (g/t) gold from the Mt Hogan historical gold mine within its Gilberton gold project in North Queensland.

Reverse circulation (RC) drilling was completed with 38 holes, for 4275 metres, drilled to test the extent of the known gold mineralisation at depth and along strike extensions.

Results have been received for the remaining 29 holes with a best intersection of one metre at 34.5 g/t gold.

Other results include two metres at 7.6 g/t gold from 16 metres including one metre at 13.45 g/t gold from 16 metres, and one metre at 10.65 g/t gold from 27 metres.

Results for the first batch of holes were received in mid-July which saw a peak intersection of four metres at 12 g/t gold including one metre at 38.5 g/t gold.

“Interim assay results for the first nine RC drillholes previously revealed multiple intersections of high-grade gold mineralisation. As shown today, the second batch of results provided additional high-grade intersections,” Managing Director Mark Derriman said.

“Results of this calibre leave the company on track to meet the primary goal of its 2022 drilling operations; to further define the multiple gold lode system at the Mt Hogan mine, in addition to extension drilling along the seven kilometre mineralised zone.

“In addition, the next phase of drilling will further extend our understanding of the multi-lode gold system to the east and west of Mt Hogan, which has only been lightly drill tested to date.”

ActivEX has ended the day 14.3 per cent in the green with shares trading at 4 cents.

AIV by the numbers
More From The Market Online
The Market Online Video

ASX Market Close: Bourse finishes week on a high as Wisetech pummeled | November 22, 2024

The ASX200 closed up 0.85% at 8,393 points. Economists increasingly expect interest rates in Australia won’t…
The Market Online Video

HotCopper Highlights: Your most watched stocks for Week 47, 2024

In this segment we’ll look at the top stocks HotCopper users have been watching, and discussing,…
Nuclear explosion mushroom cloud concept

Week 47 Wrap: HotCopper users’ most watched; Brent lifts on Putin’s scary letter; RFK dents CSL

Welcome to the end of another week. Let's start with what HotCopper users have been watching…
Dale Gillham's photo, and wording 'Words from Wealth Within's Chief Analyst Dale Gillham.

Dale Gillham’s weekly wrap: Sigma-Chemist Warehouse merger creates pharma powerhouse

The $8.8 billion dollar merger between Sigma Healthcare and Chemist Warehouse is poised to reshape the Australian pharmacy landscape, consolidating power in th…