Source: La Trobe Magnesium/Twitter
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Latrobe Magnesium (LMG) selects Samalaju Industrial Park in Sarawak, Malaysia as the preferred location for its 100,000-tonne-per-annum magnesium plant project
  • LMG says the Samalaju Industrial Park will use hydroelectric power generation, allowing the company to operate with 100 per cent renewable energy
  • The project is approved for a 40-hectare site, with preparations to commence following land application approvals and pre-feasibility studies
  • This opportunity positions the company to become the world’s cleanest and largest magnesium producer by volume
  • LMG shares are down 1.64 per cent, and trading at six cents at 1:55 pm AEDT

Latrobe Magnesium (LMG) has selected Samalaju Industrial Park in Sarawak, Malaysia as the preferred location for its 100,000-tonne-per-annum magnesium plant project.

LMG said the Samalaju Industrial Park offered “significant benefits” due to its presence of hydroelectric power generation, allowing LMG to operate with 100 per cent renewable energy.

The company said it plans to operate with net zero emissions once the plant is commissioned.

Following discussions with ministry officials and authorities in the Sarawak Government and the Bintulu Development Authority, the project has been approved for a 40-hectare site location.

The company plans to conduct phase B of its pre-feasibility study to estimate its financial return based on revenue and location cost at the selected location.

The park was chosen for its substantial industrial employment base, paired with high amounts of ferrosilicon producers, which are significant reagent requirements.

The park also contains a substantial modern bulk handling port, which is suitable for importing and exporting up to seven million tonnes per annum of bulk products, with the capacity to expand to 18 million tonnes per annum.

LMG said it plans to commence the land application process to secure the land as soon as possible.

This opportunity positions the company to become the world’s cleanest and largest magnesium producer by volume.

LMG shares were down 1.64 per cent, and trading at six cents at 1:55 pm AEDT.

lmg by the numbers
More From The Market Online

Vita Resources advances planning for ICE project 2027 exploration program

Vita Resources has lodged a revised application for the ICE Polymetallic project with field work targeted…
The Market Online Video

Market Open: Wall Street’s AI wreck rattles markets, but NextDC tells a different story

The Australian sharemarket is heading for a weaker start on Friday, with ASX 200 SPI futures…

Antares Metals hits shallow gold in test of anomaly at Enterprise in WA

Antares Metals has identified gold in assays from the first 16 holes of an AC drilling…
HotCopper Daily Market Trends Graphic

Thursday’s HotCopper trends: NEXTDC, Aldoro Resources, SciDev and other daily topics

Thursday’s HotCopper trends: NEXTDC, Aldoro Resources, SciDev and other daily topics including the latest ABS employment…