The Valaris 107 jack-up drilling rig. Source Emperor Energy ASX announcement November 2 2026.
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Full form contract to secure the Valaris107 jack-up drilling rig
  • Valaris107 jis currently operating in the offshore Gippsland Basin
  • Expected to become available following completion of current commitments in April 2027
  • Judith-2 drilling environment plan was approved in late September

Emperor Energy (ASX: EMP) has executed a contract with ENSCO Australia to secure the Valaris107 jack-up drilling rig to drill the Judith-2 appraisal well offshore Victoria.

The Watchlist — short video interviews with ASX leaders. Watch now.

The contract secures the availability of the jack-up rig for a minimum period of 30 days to drill the well and a subsequent optional 15 days for flow testing with the rig scheduled to be available from April 2027.

Upon execution of the contract Emperor has paid ENSCO’s parent Valaris US$2 million. This is in addition to the US$1.5 million paid upon execution of the prior term sheet in early September.

The operating day rate for Valaris 107 is US$165,000, with the total of US$3.5 million in payments credited against the aggregate value of the drilling contract. Further contract payments to Valaris will then occur in 2027 prior to the April mobilisation of the drilling rig.

Valaris 107 is currently operating in the offshore Gippsland Basin and will continue to undertake further drilling activities in the region for other operators before moving to the Judith-2 appraisal well.

“The Valaris 107 jack-up drilling rig is operating nearby at a very high level of safety, efficiency and productivity,” Emperor Energy CEO, Tim Handley, said.

“Securing this drilling rig for April 2027 is a major step forward for Emperor Energy as the company pushes forward towards drilling the Judith-2 appraisal well.“

The Judith-2 appraisal well drilling environmental plan (EP) was approved by the National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) in late September providing Emperor Energy with the key drilling approval required for the Judith-2 well.

The Judith-2 appraisal well is located in permit VIC/P47 within the Gippsland Basin, located approximately 36–37 km south of Marlo and 46 km southeast of Lakes Entrance in Victoria.

EMP was up 2.35% to 8.7¢. Mkt cap $85.95M.

Join the discussion: See what HotCopper users are saying about Emperor Energy and be part of the conversations that move the markets.

The material provided in this article is for information only and should not be treated as investment advice. Viewers are encouraged to conduct their own research and consult with a certified financial advisor before making any investment decisions. For full disclaimer information, please click here.

emp by the numbers
More From The Market Online

Prospect Resources reports fresh copper hits at Mumbezhi as drilling blitz continues ahead of scoping study

Prospect Resources (ASX: PSC) has unveiled its latest drill assays from on-site its Mumbezhi copper project with fresh ‘higher-grade
Aerial shot of works on-site at Mumbezhi Copper Project, Zambia

Why Prospect Resources’ (ASX:PSC) Mumbezhi Copper Project is worth keeping eyes on

ASX-listed Prospect Resources’ (ASX: PSC) Mumbezhi Project is a promising copper opportunity, with gold and cobalt by-products, in Zambia’s North-Western Province, and one worth
The Market Online Video

Market Close: ASX edges lower as financials weigh, while materials buck the trend

The Australian sharemarket finished lower on Monday, but the modest decline in the headline index masked a much weaker picture across the broader

Downer EDI lands $1.1 billion critical NSW power project contract

Downer EDI has been awarded a contract by EnergyCo on the delivery transmission line works for…