Bardoc Gold (ASX:BDC) - Bardoc Gold Project, Western Australia.
Bardoc Gold Project, Western Australia.
Source: Bardoc Gold
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Bardoc Gold’s (BDC) latest cashflow optimisation study estimates a 14 per cent increase in gold production at its flagship project within its first five years of operation
  • The company is proposing to host its processing facility at the Aphrodite deposit of its namesake project as a rationale for the increased forecast
  • The project touts a life-of-mine pre-tax cash-flow of $795 million and a pre-tax net present value of $524 million and 42.8 per cent internal rate of return
  • Bardoc Gold Chief Executive Officer Robert Ryan says the new strategy would deliver increased production, cash flow and financial returns
  • Bardoc Gold shares are down 1.47 per cent to trade at 6.7 cents

Bardoc Gold’s (BDC) latest cashflow optimisation study has estimated a 14 per cent increase in gold production at its flagship project within its first five years of operation.

The study commenced in the beginning of August and was hoped to increase gold production rates and free cash flow at its wholly-owned Bardoc Gold Project in the Eastern Goldfields of Western Australia.

Based on the outcomes of the study, Bardoc believes its project could produce an additional 80,000 ounces or 14 per cent more gold than initially forecasted.

In order to facilitate this, Bardoc said it plans to shift its proposed processing facility from its Zoroastrian and Excelsior deposits to the 1.6-million-ounce Aphrodite deposit.

The project touts a life-of-mine pre-tax cash-flow of $795 million and a pre-tax net present value of $524 million and 42.8 per cent internal rate of return.

Bardoc Gold Chief Executive Officer Robert Ryan said the new strategy would deliver increased production, cash-flow and financial returns.

“Bringing forward development of the cornerstone Aphrodite deposit will see Bardoc reach the 150,000 ounces per anum gold production milestone by year three,” he said.

“The plan also de-risks the project by bringing forward the capital expenditure for the flotation circuit and increasing gold production by 80,000 ounces in the first five years.”

A final investment decision for the project is expected by December 2021.

Bardoc Gold shares were down 1.47 per cent at 1:17 pm AEST to trade at 6.7 cents.

BDC by the numbers
More From The Market Online

Patagonia grows portfolio of REE and lithium-focused territory with exploration grants

Patagonia Lithium Ltd has been granted an additional 15 exploration licences in Argentina where it is…

The curious tale of Poseidon Nickel’s restart of works at Lake Johnston

Poseidon Nickel – now a penny-stock – has announced it's restarted exploration at Lake Johnston a…

Tambourah gets state govt grant for drilling at namesake gold project in WA

Tambourah Metals Ltd is set to prioritise diamond drilling at flagship gold project in WA after…

Vulcan smashes through $5/sh resistance level as final funding stage live

Vulcan Energy Resources has been on a comeback story YTD in 2024. It's now at the…