EcoGraf (ASX:EGR) -
Source: EcoGraf
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Ecograf (EGR) has pinned down costs and production estimates for its modular recycling pilot plant in Western Australia
  • A scoping study completed by GR Engineering estimated the pilot plant’s capital cost at $5.8 million
  • The facility is set to use Ecograf’s “HFfree process”, which seeks to recover carbon battery anode material from production waste
  • A pilot plant is hoped to boost the commercial and technical viability of the project amid increased recycling battery mandates
  • Ecograf shares are up 1.01 per cent to trade at $1.01 at 11:32 am AEST

Ecograf (EGR) has pinned down costs and production estimates for its modular recycling pilot plant in Western Australia after completing an engineering scoping study.

The capital cost associated with the company’s planned lithium-ion battery anode recycling pilot plant is expected to total roughly $5.8 million, based on a study by GR Engineering.

Process plant, equipment purchase and construction direct costs are forecast at around $4 million, with the remaining $1.8 million representing “indirect” costs.

The facility will use Ecograf’s “HFfree process”, which seeks to recover carbon battery anode material from production waste to produce battery materials.

According to EGR, the pant will operate as a standalone facility with throughput rates based on a single shift, five-day operating week.

The pilot plant is hoped to demonstrate purification flowsheet capability, and provide customers with product sample volumes for technical and commercial assessment.

Ecograf affirms the plant could also provide a “customised solution to support new legislation from the EU Commission that demands increased battery recycling”.

Looking ahead, EGR said it was developing work programs with potential partners to support the plant.

Ecograf shares were up 1.01 per cent to trade at $1.01 at 11:32 am AEST.

EGR by the numbers
More From The Market Online

EV Resources on ‘accelerated pathway’ to Los Lirios restart after strong antimony recovery tests

EV Resources is inching closer to a Los Lirios restart after strong metallurgical results set up…
Diamond drilling at Bankan.

‘Inferior’: Perseus backs down on Predictive merger – but not without swipe at Robex

Perseus Mining has thumbed its nose at Robex as it heads out the door, stepping away…
A dirt road running through the Antimony Canyon project in Utah.

American Tungsten and Antimony leaves ‘Trigg’ name behind to start next era (and set fresh focus)

American Tungsten and Antimony has entered a new era, leaving the name "Trigg Minerals" behind to…
Drill rig concept

EV Resources kicking off maiden drilling for antimony at Los Lirios, Mexico

EV Resources is geared up for a maiden drilling run right out the gate into 2026…