Drilling at Yarrabubba. Source: Ian Prentice/Twitter
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Technology Metals (TMT) confirms broad, high-grade massive magnetite mineralisation at its Yarrabubba Iron-Vanadium Project in WA
  • The company drilled 37 holes to infill and extend the mineral resource estimate which will ultimately help to upgrade the ore reserve estimate
  • Results include grades of up to 50.2 per cent iron, 1.16 per cent vanadium pentoxide and 13 per cent titanium dioxide and TMT believes this work will improve the mineral resource and ore reserve
  • Company shares were up 6.02 per cent to trade at 44 cents

Technology Metals (TMT) has confirmed broad, high-grade massive magnetite mineralisation at its Yarrabubba Iron-Vanadium Project in Western Australia.

The Yarrabubba Project is a ‘satellite project’ of the company’s Gabanintha Project and represents an opportunity to produce a premium iron-vanadium concentrate with grades of above 63 per cent iron and over 1.6 per cent vanadium pentoxide.

Yarrabubba hosts an indicated and inferred mineral resource of 27.7 million tonnes at 38.7 per cent iron and 0.9 per cent vanadium pentoxide. It also has a maiden probable ore reserve estimate of 9.4 million tonnes at 45.3 per cent iron and 0.97 per cent vanadium pentoxide.

TMT drilled 14 reverse circulation holes and 23 diamond holes to infill and extend the mineral resource estimate (MRE) as well as expand the measured and indicated components.

The company will use the improved MRE to upgrade the project’s ore reserve estimate.

Drilling in the southeast of the resource area returned results including 24 metres at 50.2 per cent iron, 1.13 per cent vanadium pentoxide and 12.8 per cent titanium dioxide from 176 metres and 26.5 metres at 46.6 per cent iron, 1.06 vanadium pentoxide and 12.1 per cent titanium dioxide from 21.5 metres.

Additional high-grade results include 67 metres at 36.6 per cent iron, 0.81 per cent vanadium pentoxide and 9.4 per cent titanium dioxide from 69 metres including 15 metres at 49.6 per cent iron, 1.16 per cent vanadium pentoxide and 13 per cent titanium dioxide from 114 metres.

Managing Director, Ian Prentice, was pleased with the drilling results.

“The drilling at Yarrabubba has highlighted the wide consistent nature of the orebody. We are confident that the drilling will result in an increase in the mineral resource estimate and ore reserve.”

Company shares were up 6.02 per cent to trade at 44 cents at 10:58 am AEST.

TMT by the numbers
More From The Market Online

Lithium Universe ends the quarter charged up for Quebec Refinery roll-out

Lithium Universe has closed off the March quarter with a new Chief Financial Officer and strategically located land…

Alligator snaps at extended mineralisation of Blackbush uranium deposit in SA

Extension drilling in the first four months of this year at the Samphire Uranium Project in South Australia has enabled Alligator Energy Ltd

Mine study work sees 70% boost in gold resource for Nexus in WA’s Goldfields

Nexus Minerals has bumped up the Crusader-Templar combined mineral resource estimate by more than 70% at…

Patriot revs up to lithium grades above 5% drilling at Corvette in Quebec

Patriot Battery Metals has identified solid lithium intersects across wide intervals from drilling at its Covette…