The N-S drive intersected in hole 26MEDD004 showing traces of quartz “spur veins” in the walls and backs.
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

Black Horse Mining (ASX: BHL) has achieved early success with its initial program at the historic Mt Egerton project in Victoria, with the first drill results identifying shallow, high-grade gold of up to 17 grams per tonne.

Listen to the HotCopper podcast for in-depth discussions and insights on all the biggest headlines from throughout the week. On Spotify, Apple, and more.

Early results have also confirmed mineralised spur veins, while the accuracy of the location of historic shaft locations has been significantly increased.

Gold at Mt Egerton was initially discovered in 1853, before it then went on to become one of only eight Victorian gold mines to produce over one million ounces from primary sources. Mined until 1906 when water ingress led to closure, it is one of the few significant historical gold mines in Victoria that has not had extensive recent work after being tied up by a private owner for 25 years.

Black Horse’s MD, David Frances, said first drilling from Mt Egerton have confirmed high-grade, near-surface gold mineralisation and further strengthened the company’s confidence in the project’s structural and geological model.

“Importantly, the program also improved our understanding of the historic workings and likely shaft locations, while the identification of mineralised spur vein zones highlights the broader potential of the system,” he said.

“With assays still pending from additional holes and planning already underway for the next phase of drilling, including deeper holes to test priority targets, we believe Mt Egerton is continuing to demonstrate strong exploration upside.”

Next drilling is expected to get underway this month and will target shaft locations, follow-up results, extend drilling into other known areas of historical results and begin the deeper drilling required to test two leading targets.

Mr Frances said Black Horse’s next drilling campaign will be undertaken by a staged rig capable of obtaining larger diameter core, which will then help the explorer with core recoveries in the conditions encountered in the first program and to enable holes of up to 1000m of HQ core to be drilled.

Initial program hole 26MEDD005 encountered a significant zone of mineralisation over 5.2 metres from 55.5 metres to 61 metres down hole; however, core recoveries through this particular zone were intermittently poor, which then resulted in insufficient sampling material between assayed core.

BHL is down -3.8% to 38cps on Wednesday.

Join the discussion: See what HotCopper users are saying about Black Horse Mining Ltd and be part of the conversations that move the markets.

The material provided in this article is for information only and should not be treated as investment advice. Viewers are encouraged to conduct their own research and consult with a certified financial advisor before making any investment decisions. For full disclaimer information, please click here.

bhl by the numbers
More From The Market Online

KGL Resources jumps 25% on US$300M funding deal

KGL Resources has entered into a US$300 million PMPA to help fund construction and development of…
London

With osteo Phase 3 trial at 50% recruitment, Paradigm Bio inks partnership with University of London

Paradigm Biopharma (ASX:PAR) has this week hit two big items out the park: first of all, hitting 50% recruitment

Terra hits multiple intersections at Southwest SW6 prospect; assays now due in next ~12 weeks

Terra Metals has hit multiple intersections of massive sulphides in drilling at the Southwest SW6 prospect…
Easter bunny in a business suit analyzing stock charts, symbolizing market strategy

ASX closed for Easter long weekend. Enjoy your chocolates and the holiday break!

Yes, yes, I know you’re itching to do some serious Australian market trading today, but everyone — especially our much-loved HotCopper forum users