Isometric view of nested three-stage open pit optimisations at Stavely showing MRE primary resource blocks.
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Study delivers compelling economic outcomes
  • Average annual free cash flow from first production estimated at $110M
  • Mining production of 51.4Mt of process plant feed from single open pit
  • Total production of 210,000 tonnes of CuEq in concentrate

Stavely Minerals (ASX:SVY) has completed a robust Scoping Study on potential production from the Thursday’s gossan and cayley lode copper-gold-silver deposits, part of the company’s 100%-owned Stavely project in western Victoria.

Listen to the HotCopper podcast for in-depth discussions and insights on all the biggest headlines from throughout the week. On Spotify, Apple, and more.

The project development envisages a standalone conventional process plant with a front-end crushing and grinding circuit and back-end sulphide flotation cells with an annual throughput capacity of 4.0 million tonnes per annum (Mtpa).

The Thursday’s gossan Scoping Study is based on a mineral resource estimate (MRE) of 59 million tonnes (Mt) at 0.58% copper equivalent (CuEq).

The Scoping Study delivered compelling financial outcomes, including:

o Estimated pre-tax NPV7 of $818 million;

o Estimated pre-tax IRR of 40%;

o Projected capital payback in 2.5 years of production;

o Average annual free cashflow from first production  estimatedm at$110 million;

o Net cashflow from operations estimated to be $1.4 billion;and

o Life-of-mine estimated AISC of US$3.76/lb copper equivalent and first three-years AISC of US$2.75/lb copper equivalent.

The Scoping Study includes an estimated $333 million capital cost for the process plant and mine-site infrastructure post-FID, inclusive of a 30% contingency, together with an additional $139 million estimated for pre-production operations, including open pit pre- stripping.

The study envisages a conventional standalone on-site processing plant with a front-end crushing and grinding circuit and back-end sulphide flotation cells, concentrate thickening and drying with an annual throughput capacity of 4.0 million tonnes per annum (Mtpa).

Transport of concentrate will be undertaken in shipping containers by road 150km to the deep- water port of Portland for export.

SVY is down 3.13% to 1.6¢. Mkt cap $16.52M.

Join the discussion: See what HotCopper users are saying about Stavely Minerals and be part of the conversations that move the markets.

The material provided in this article is for information only and should not be treated as investment advice. Viewers are encouraged to conduct their own research and consult with a certified financial advisor before making any investment decisions. For full disclaimer information, please click here.

svy by the numbers
More From The Market Online

Kaoko Metals eyes expanded Chalkos drilling after strong investor interest at ADU

Kaoko Metals is accelerating exploration at its Chalkos Copper-Silver Project after strong investor interest at Africa…

The lithium supply race is going global — and ASX miners are positioning for the next wave

Already surging from a strong demand and price turnaround, lithium continues to receive massive funding support…

Omega Oil & Gas kicks off key new Taroom Trough well at Canyon-4

Omega Oil & Gas has kicked off the next key well aimed at confirming the world-class…
The Market Online Video

ASX Today: Energy stocks hold the line as Middle East tensions lift oil

The Australian sharemarket was holding steady today, with energy stocks helping offset weakness across technology as escalating tensions in the Middle East pushed